BESS Energy Storage
40KW 96KWH BESS Energy Storage System | Industrial Solar Battery Cabinet
The 40KW 96KWH BESS is an all-in-one outdoor energy storage system for commercial and industrial use. Features 96KWH LiFePO4 battery (16KWH×6 modules), 40KW hybrid inverter with AC charger, and 70pcs 590W N-type TopCon solar panels.- Battery Capacity: 96KWH
- Product Details
- Download
![]() |
Solar Panel 1. Using N-type 16-18BB solar cell, the power generation efficiency is 25.5% 2. Using fully automatic slicing process,100%guarantees that there are no gaps in solarcell. 3. Quality control:Cell efficiency /cell power sorting 4. 4times EL test 5. The automatic confluence welding processof cells is adopted to ensure no false welding 6.Fully automatic glue filling process toensure the service life of solar panels up to 30 years 7. Packed in wooden boxes to ensure the safe delivery of the goods |
![]() |
On and off grid hybrid inverter 1.Perfect function: get the power to the grid,AC Grid Charger Build In 2. Protective Functions: Protection Against Over load, Short-Circuit, Over Heat, 3. Anti-isolated Island Efficiency,Polarity Joint-Reversed,5Years Warranty |
![]() |
[Key Specifications] • Rated Power: 40KW • Battery Capacity: 96KWH (307.2V 314AH) • Battery Configuration: 16KWH × 6 modules • Cycle Life: >6000 cycles • Inverter: 40KW hybrid on/off-grid with built-in AC charger • Solar Panel: 70pcs 590W N-type TopCon (41.97V, 23% efficiency) • System Daily Output: 247.8KWH • Max Load Power: 40KW |
[System Components]
1. Solar Panels: 70pcs 590W N-type TopCon half-cell mono panels, 25 years warranty
2. Hybrid Inverter: 40KW S6-EH3P40k-H, 150-850V MPPT range, 5 years warranty
3. Battery Cabinet: Outdoor IP-rated cabinet with smoke detectors, lighting, fire protection (aerosol), and air conditioning
4. Mounting Bracket: Rooftop/Ground install, customized, 10 years warranty
5. Cables & Connectors: Professional battery cables, PV cables, DC breakers, SPD
[Applications]
• Factory peak shaving and load shifting
• Solar + storage hybrid systems
• Commercial backup power
• Microgrid energy management
• EV charging station power supply
[Warranty & Service]
• Solar Panels: 25 years
• Inverter: 5 years
• Battery System: 10 years
• Free system design service
• Online installation guidance
• Engineer on-site support available
[Packaging & Delivery]
• Total Volume: 12CBM
• Total Weight: 2940KG
• Delivery: 15-45 working days after payment
• MOQ: 1 set
40KW 96KWH FAQ
Q: What applications is the 40KW 96KWH BESS suitable for?
A: Ideal for factory peak shaving, demand charge reduction, commercial backup power, solar + storage hybrid systems, and small to medium industrial facilities.
Q: Can I expand the battery capacity later?
A: Yes, multi-cabinet parallel connection is supported. You can add more cabinets to scale capacity as your energy needs grow.
Q: What is the warranty coverage?
A: Solar panels: 25 years, Inverter: 5 years, Battery system: 10 years, Mounting bracket and cables: 10 years.
Q: How long does installation take?
A: Typically 1-2 days for the solar panel and mounting system. Complete system installation can be completed within 15-45 working days after payment.
Q: Does it work during grid outages?
A: Yes, the hybrid inverter has grid bypass function and can provide backup power when the grid goes down.
Q: What maintenance is required?
A: Minimal maintenance. The integrated HVAC and BMS handle most monitoring automatically. Annual inspection recommended.
Welcome to our company website, thank you for your letter, we will give you a reply in the first time, would you please leave your information and contact way!

