A few days ago, Spain’s Ministry of Ecological Transition (Miteco) revealed that a 3.3GW renewable Build Solar Power System energy tender will be held in November, including 1.8GW of solar and 1.5GW of wind, and the selected photovoltaic projects must be built within two years and will receive 12-year Power Purchase Agreement (PPA).
This is the fourth tender held in Spain. As with previous renewable energy tenders, bidders will be required to submit a strategic plan with implications for local jobs and supply chains.
It is understood that Miteco awarded 2.90GW of solar capacity and 3.25GW of wind capacity in the first two tenders held in January and October 2021. A total of 3.12 GW was awarded in the second auction, representing 95% of the proposed 3.3 GW, with a total wind capacity of 2.258 GW and solar 866 MW at an average price of €30.56/MWh. In the third tender, launched last December, Spanish authorities aimed to allocate 500 megawatts of renewable energy capacity, including 140 megawatts of distributed solar.
-
10kw Home Solar System-Trinidad and TobagoAre you tired of constantly worrying about rising electricity bills ? Look no further! Our solar power systems are the perfect solution for you. Just ask our satisfied customer from Trinidad and Tobago, who recently purc
Do you like ?0
Read more -
Village in the mountains with solar system“We have to go back and forth several hundred meters to fetch water from the mountain every day,” a villager told us. "Our village has been living in the mountains for generations. Travel is not that convenient, and water and electricity
Do you like ?0
Read more -
100KW Commercial Solar Power Will Be Soon In Nigeria HotelDavid, a Nigerian resident living in Guangzhou, China, has become a true "China expert" after spending 20 years in the country. His family in Nigeria operates 15 hotels, and David is responsible for procu
Do you like ?0
Read more -
Let factories use electricity for freeThe Philippines has abundant sunshine, and the solar system can start generating electricity at 6.30 in the morning and stop generating electricity at around 17.30 in the afternoon. The peak power generation is between 10.00 and 15.00. A cus
Do you like ?0
Read more -
5KW Off-grid Solar Setup In Congo HospitalWith Mars solar off-grid solar setup, a hospital from democratic republic of the Congo now harnessing the power of the sun to run medical appliances. Here are some highlights of Mars off-grid solar system's fun
Do you like ?0
Read more -
Mars Half-Cell Solar Panel Vs Another Half-Cell Solar PanelTOPCon half-cell solar panels have the following features: 1. High efficiency: TOPCon’s silicon wafer efficiency can reach up to 25.2%, which is 2% higher than other solar panels. It is expected that by the second half of 2023, TOPCon can reach 26
Do you like ?0
Read more