News
Home / News /

EU plans to install 600GW of photovoltaic grid-connected capacity by 2030

0

Published by Mars September 19,2022

Quick answer: A 1KW solar system of this configuration produces about 6.3KWH per day from 3x350W monocrystalline panels and driven by a 1KW/1.5KVA inverter. Built by Mars Solar (factory since 2008), CE/ROHS certified, 25-year panel life, shipped factory-direct to 130+ countries.

    According to TaiyangNews reports, the European Commission (EC) recently announced its high-profile "Renewable Energy EU Plan" (REPowerEU Plan) and changed its Residential Solar Panel System renewable energy targets under the "Fit for 55 (FF55)" package from the previous 40% to 45% by 2030.

Solar Power System Home

 

    Under the guidance of the REPowerEU plan, the EU plans to achieve a grid-connected photovoltaic target of more than 320GW by 2025, and further expand to 600GW by 2030.

 Solar Energy Products

    At the same time, the EU decided to formulate a law to mandate that all new public and commercial buildings with an area greater than 250 square meters after 2026, as well as all new residential buildings after 2029, are equipped with photovoltaic systems. For existing public and commercial buildings with an area greater than 250 square meters and after 2027, the mandatory installation of photovoltaic systems is required.

< >
Latest posts