Recently, the latest monthly data released by Bundesnetzagentur, a German federal network agency, showed that in May 2020, Germany added a new large-scale solar solar power system for home gold coast capacity of 121.4MW, and a total of 33 ground installation projects were put into production.

It is reported that the newly installed solar capacity in Germany reached 446MW in May, which was the highest monthly installed capacity in 2020. As of the end of May, the newly installed solar capacity in Germany was close to 1926MW in 2020.
The German government promised last year that once the installed power generation capacity reaches the 52GW limit, public subsidies for power generation systems above 750kW will be cancelled. Therefore, of the newly installed capacity of 446MW, the installed capacity of subsidized rooftop photovoltaic systems is not less than 321MW.
According to data from Bundesnetzagentur, as of the end of May, the cumulative installed capacity of solar energy in Germany reached 50.88 GW, and the lower house of the Bundestag abolished the solar ceiling this month.

In addition, since the subsidy will adapt to the new installed capacity, the solar subsidy will be reduced by 1.4% from July.
-
How Much Does Solar Cost in Nigeria? 2026 Real Pricing GuideSolar cost in Nigeria for 5kW to 250kW systems, in Naira and USD. Compare solar vs diesel vs grid, calculate payback, and explore financing options.Do you like ?0
Read more -
Solar Power Nigeria 2026: Off-Grid vs Hybrid vs On-GridNigeria’s unreliable grid and soaring diesel costs are forcing business owners to take solar seriously. But the biggest question remains: which system — off-grid, hybrid, or on-grid? This 2026 guide breaks down all three solar architectures for NigeriaDo you like ?0
Read more -
Solar Panel Certifications Explained: IEC, UL, TÜV, CE, ISO — The 2026 GuideA solar panel without proper certifications is unsellable in 90% of international markets. This 2026 guide explains every major certification — IEC 61215, IEC 61730, UL 61730, TÜV, CE, ISO 9001/14001/45001 — what it tests, who issues it, which markets reqDo you like ?0
Read more -
Solar Panel Shipping & Container Loading: The 2026 Complete GuideThe solar panels leaving the factory are perfect. By the time they arrive at your warehouse, 3–7% might be damaged, delivery could be 2 weeks late, and demurrage at the destination port could wipe out your margin. This 2026 guide covers container types (2Do you like ?0
Read more -
Solar Panel Factory Verification: The 7-Step Due Diligence GuideEvery year, international solar buyers lose millions to fraudulent suppliers — fake certificates, empty factories, and panels that don't match spec. This 7-step verification guide shows you exactly how to qualify any China solar factory before you wire moDo you like ?0
Read more -
Solar Panel MOQ, Lead Time & Payment Terms: The Complete 2026 Buyer's GuideMOQ, lead time, and payment terms are the 3 questions every solar buyer asks — and the 3 answers most suppliers hide behind vague emails. This guide gives you complete, honest answers from a verified China factory with 17+ years and 3,000+ export projectsDo you like ?0
Read more