High Energy
Consuming
Factories
Island
Microgrid
Sewage
Works
Resort
Hotel
Restaurant
Store
Others
Collect data and design
Production and test
Installation and training
Regular inspection
Sales engineers with over 5 years of experience provide 24/7 online consulting services.
Clients provide monthly electricity bills, load profiles, site photos, address data, etc., or can schedule online/on-site engineer surveys.
Six engineering teams with over 5 years of experience conduct system design based on collected data and client requirements.
The engineering team provides solar system solutions within 24 hours, delivering layout diagrams and electrical diagrams.
Production starts within 1 hour after the client confirms the solution and pays the deposit, with completion in 3-30 days. Our ISO quality control department monitors the entire production process to ensure product quality.
After 72-hour full-load testing and final quality assurance checks, inspection videos and photos are taken. Qualified products are then packaged and loaded into containers for shipment on the agreed date.
Six certified Chinese engineering teams ensure rapid installation and stable operation, reducing construction time by 50% and installation costs by 40%. We provide 2-hour to 2-day comprehensive training on system operation and maintenance, guaranteeing over 30,000 hours of trouble-free operation.
Includes engineer on-site inspections/online video inspections. Clients can schedule maintenance 1 month in advance.
Foshan Mars Solar Technology Co., Ltd.
1.We have over 17 years of experience in solar technology production and international solutions.17
yearsManufacturing experience
12
yearsEngineering installation experience
1000
+Engineering project experience
2,000
+Trained customer engineers
In April 2024, Mars Solar installed a 200kW solar system at a metal recycling plant near Manila. The 6 day project included solar panel mounting, inverter integration, and lithium battery setup to ensure 24/7 operations. Engineers trained the facility’s staff on maintenance and monitoring, with all components labeled with QR codes for swift troubleshooting. The system slashes grid dependency by 70%, reduces energy costs, and supports the Philippines’ industrial sustainability targets.
In September 2023, Mars Solar installed a 250kW solar system at a Manila wastewater treatment plant. The 11 day project included panel setup, inverter integration, and lithium battery installation, enabling 24/7 clean energy operations. Engineers trained facility staff and labeled components with serial numbers for maintenance. By replacing diesel generators, the system reduces noise pollution, cuts carbon emissions, and supports the Philippines’ sustainability and clean water initiatives.
The factory can use electricity for free!
In December 2023, they started planning to install a solar system to saveelectricity bills, because they consume up to 28,668kwh of electricity every month, and the electricity bill is416,730 pesos, equivalent to more than 7,000 US dollars.
After consulting with us at Mars Solar, we designed and sent people to install a 400kw solar system.This is theirelectricity bill after using the solar system. They consume 26,048kwh of electricity in a month, but they don’thave to pay any more electricity bills!
In March 2024, Mars Solar deployed a 150 kW solar energy system at a Philippine resort, completing installation and commissioning in just 5 days. The hybrid system integrates high-efficiency photovoltaic panels with lithium-ion battery storage, enabling 24/7 uninterrupted power even during peak demand or grid outages. By replacing 80% of diesel generator usage, it cut noise pollution by 40 decibels, enhancing guest comfort.Tourists report improved sleep quality due to quieter nights and uninterrupted amenities like air conditioning and pool facilities. The project also includes a smart monitoring platform for real-time energy optimization, ensuring long-term reliability in typhoon-prone regions.
Q:What is the return on investment for installing solar energy systems?
A: According to our customer statistics, 95% of customers can recover all costs within 1-2 years.Q:Is there a charge for survey and installation?
A: The survey fee is charged at a rate of 200 USD each time. This fee needs to be paid before the project starts and will be refunded after the project is completed Installation fees vary depending on the project, and you can consult the project first and then understandQ:How long can you provide me with the design drawings?
A: When Mars Solar receives sufficient information, we will provide the corresponding drawings and designs within 24 hours.Q:What should I do if I have any questions during the use of the product?
1.A: You can schedule an engineer for an online video conference to solve your usage questions 2.A: Mars Solar organizes annual inspection and maintenance activities. You can contact us to registerLeave your mobile number/whatsapp/email and we can respond within an hour!
Get free consultations, catalogs, product specifications, quotes and more now.Leave your mobile number/whatsapp/email and we can respond within an hour!
Get free consultations, catalogs, product specifications, quotes and more now.